Code No. 801.1
BUILDINGS & SITES LONG RANGE PLANNING
As part of the board's long range plan for the school district's education program, the board will include the buildings and sites needs for the education program. The long-term needs for buildings and sites will be discussed and determined by the board.
It is the responsibility of the superintendent to provide information including, but not limited to, enrollment projections and education program requirements to the board.
Legal Reference:
Iowa Code §§ 280.3, .12, .14; 297 (2013).
Cross Reference:
103 Long-Range Needs Assessment
Approved: 2/14/18
Reviewed: 11/15/23
Revised:
Grinnell-Newburg Community School District, Grinnell, Iowa